Today we riveted a lip over the top that we can attach a thin aluminium to after all the bulkheads and inside components are ready. After riveting these lips we moved on to create the front and back bulkheads, with simple bent aluminium and attached, once again, with rivets. The were rather a lot of pop rivets to pop in to place, needless to say, Nicola and I (Ailsa) had sore arms the next day.
With around 5 hours of working times, a great deal of progress was made.
All aluminium was generously donated by Building Product Design Ltd.